Energy and Delay Analysis of Contention Resolution Mechanisms for Machine-to-Machine Networks based on Low-Power WiFi

in Proceedings of the IEEE International Conference on Communication ( ICC 2013), Budapest (Hungary), 9-13 June 2013.

Authors: F. Vázquez-Gallego, J. Alonso-Zarate, L. Alonso
Category:


CTTC copyright disclaimer


For the reports in this repository we specifically note that


By accepting I agree to acknowledge and respect the rights of the copyright owner of the document I am about to access.